Concrete calculator

Yards or bags for slabs, footings, walls and holes — with rebar, forms, gravel base and vapor barrier.

Job

Units

Pours

Slabs, patios, driveways
Footings
Walls
Post holes, piers, columns

Ordering

Reinforcement

Slabs

Forms & base

Materials list

ItemQtyUnit priceCost
Concrete
Ready-mix concrete5.43 incl. 10% · 1 truck(s)5.5 cu yd$—
Reinforcement
Rebar (#4)560 LF + 10% laps31 sticks (20 ft)$—
Rebar chairsabout every 3 ft45 ea$—
Tie wire≈ 98 ties (every other crossing)1 coils$—
Forms & base
Form boards (2×4 / 2×6)80 ft of slab edge6 pcs (16 ft)$—
Form stakes31 ea$—
Duplex nails, 16d2 lb$—
Gravel base (compacted)4 in. under slabs + 15% compaction8 tons$—
Vapor barrier, 6 mil (10×100 ft)1 rolls$—

How it works

  • Volume ÷ 27 = cubic yards. An 80 lb bag makes about 0.6 cu ft, so a yard is about 45 bags.
  • Ready-mix is rounded up to your ordering step (usually ¼ yard). Rebar adds 10% for laps.
  • Add your supplier's unit prices to any line for a cost estimate; tax and markup are optional.

How to measure

  • Measure inside the forms. Use the average thickness if the grade isn't level, and add extra for soft spots.

Estimates only. Coverage, sizes and waste vary by product and job — verify with the manufacturer's specs and your local building code before ordering.